Published September 30, 2016 | Version v1
Technical note Open

Beam Impedance Studies of the PS Beam Gas Ionization Monitor

Description

The Beam Gas Ionization monitor (BGI) is a device for continuous beam size monitoring that is intended to be installed in the CERN Proton Synchrotron (PS) during the extended year-end technical stop from December 2016 to April 2017. With the objective of determining the impedance contribution of the BGI vacuum chamber to the overall beam impedance, we report on RF measurements on the device in a laboratory frame, measurement data analysis, and RF simulations of the structure under investigation. For the impedance contribution characterization of the BGI, the following approach has been followed: First, the EM fields inside a simplified BGI model that doesn't include any of the internal components of the vacuum chamber have been simulated. RF measurements have been performed on the same empty structure showing great agreement between measurement and simulation and thus verifying the validity of the model. Second, simulations have been executed on a fully assembled BGI model that includes all the internal elements of the BGI vacuum chamber with the purpose of including the impedance contribution of the BGI to the PS impedance model.

Files

Avgidis Summer Student Program Report.pdf

Files (3.8 MB)

Name Size Download all
md5:15ed7470593fb4879618c715de4e4b02
3.8 MB Preview Download

Additional details

Identifiers

CDS Reference
CERN-STUDENTS-Note-2016-252

CERN

Department
BE